A drafter who opens the Civil Code for guidance on what a court will enforce finds permissions and pointers, not rules: a loan is formed by agreement alone, interest is capped at “the limited interest rate specified by law”, and an unfixed rate falls to the legal rate. The operative answers sit in what benches have done with the paper. This article reads 108 Cambodian judgments issued between February 2015 and July 2020 — overwhelmingly first instance, with one cassation and one appeal — to ask a narrow question: when a court enforced a contract term, what was on the document that let it? The method is empirical and documentary: every judgment read, every operative order extracted, every drafting rule tied to the case that enforced or refused it, every citation checked against the text. The finding is that the instrument, not the statute, decides contract cases, and that it is judged on what appears on its face. Stated terms are enforced, occasionally at rates the Code nowhere authorises; absent, implied, oral or vague terms are not, and they fail even where the defendant never appears. Three consequences follow: interest above the ceiling is rewritten rather than refused; a delay clause above that ceiling is enforced by most benches and cut by one; and a preferential right is recognised on a registered instrument over an identified title. This is what these judgments did, not what the law requires.
Keywords: Cambodian Civil Code; Article 585; Prakas No. 128; liquidated damages; hypothec registration
I. Introduction#
A client wants a loan agreement drafted, and the drafter’s first instinct is to open the Civil Code. It is a reasonable instinct, and it does not survive contact with the file. Article 579 provides that a loan for consumption is formed by agreement alone, so no writing is required at all. Article 585 caps interest at “the limited interest rate specified by law” — a sentence that announces a ceiling without naming one. Article 584 sends an unfixed rate to the legal rate, and Article 518 hands a seller who has taken a deposit the right to rescind by returning double.1 The Code supplies permissions and pointers to instruments it does not contain. It is close to silent on the three questions a drafter has to answer: what must appear on the face of this document, what a court will do with an ambiguous clause, and what becomes of the number written into the interest box.
The answers, in so far as there are answers, are in what benches have done with the paper.
This article asks a narrow question. When a Cambodian court enforced a contract term, what was on the paper that let it — and when it struck a term down, what was missing? The thesis is that the instrument, not the statute, decides contract cases, and that it is judged on what appears on its face. A term that is stated — a price, a rate, a base, a trigger date, a title number, a signature attributable to a named person — tends to be enforced, occasionally at rates the Code nowhere authorises. A term that is absent, implied, oral or merely vague tends not to be, and it fails even where the defendant never appears. An empty dock is not evidence.
The scope is 108 judgments issued between February 2015 and July 2020.2 They are overwhelmingly first-instance decisions: one cassation and one appeal sit in the sample, and neither supplies a binding rule on interest, penalty or form. Each judgment was read in full and every operative order extracted with the reasoning and evidentiary findings behind it; every drafting rule was then tied to the specific case that enforced or refused it, so that no proposition here rests on a statute no bench applied.
The Code is generous and the courts are literal. A term the parties understood perfectly well but never wrote down does not exist. A term they wrote down badly does exist, but in the court’s version of it: rewritten, capped, recalculated, or replaced by a figure the bench considered defensible.
II. Population, method, and what this study is not#
Population and method — The study reads 108 judgments issued between February 2015 and July 2020, the earliest dated 20 February 2015.2 They were identified by content rather than by filing category: candidates were located by searching document text for the Khmer words for a judgment, a decision and an appellate ruling, and each was then opened and classified by what it actually was. Filing labels proved unreliable in both directions — plain judgments sit under other labels, and documents labelled as judgments turn out to be statutes, textbooks and reports.
Exclusions were made on kind, not on convenience. A compiler’s volume of Civil Code case studies was excluded: it discusses decided cases but carries no parties, no case number and no operative order, so it establishes nothing a drafter can cite. A Ministry of Justice training textbook was excluded for the same reason; the 1993 Law on Criminal Procedure and a government monthly report because neither is a judgment; and the International Court of Justice’s 1962 judgment on the Temple of Preah Vihear because it is not a Cambodian court.
Every remaining judgment was opened individually: its operative order, its reasoning, and the findings on evidence that carried the order, with any disagreement between reasons and order recorded. Dates are those printed on the judgments, not those the files were made. Document identifiers are given as Doc ID: <n>. Some documents are anonymised copies, with the case-number field blank and the parties reduced to initials; those are used for the rule they establish and are not citable by case number.3
Gaps — Three matter more than the rest. First, there is no binding appellate rule on interest, penalty or form. The two appellate judgments decide nothing on drafting: a cassation that remitted for a fresh hearing without reaching the merits, and an appeal that decided a procedural question about a pending criminal case and left the contract untouched.45 Second, whole categories are missing: no employment, insurance, energy or company-law judgment here at all, and the commercial categories that do exist are thin to the point of anecdote — one works contract, one lease, one service contract, each n=1 — with the lease deciding nothing, because the claim was struck out when the plaintiff failed to appear.6 Third, the sample is bounded by its dates and weighted to the last year it covers; rates, filing practice and the bench may all have moved since.
Limitation — This is a study of what 108 first-instance-heavy judgments did, not a statement of what the law requires. The sample is skewed to Phnom Penh and to the last year it covers, and provincial courts appear in smaller numbers, with differences visible in the orders rather than explained in the reasons. The English is the author’s translation of Khmer originals that govern; where the two could be read differently, the Khmer text is the judgment and the translation is a convenience. Where the study states a rule, the rule is what the court enforced in the case cited, and nothing more: a rule that appears here once is a thing that happened once. Prakas No. 128 K.Y.Pr.K/11 of 21 December 2011 is named in the judgments but is not itself among the documents studied, so the ceiling described below is established by what courts did with it rather than by its text.
III. The judgments that decide the argument#
The order below is contractual, not chronological; four further judgments, on services, penalty, security and enforcement, are argued later.
A moneylender sued on a 17,000,000 riel loan at 3 per cent a month, recorded in a contract whose date the file gives as both 06 May and 06 June 2017.7 On cassation the Supreme Court called the contract “the law of the parties”, then set aside the Court of Appeal’s judgment for failing to examine whether the money had actually been paid, and remitted for a fresh hearing. The rule is narrower than the headline: the instrument proves the promise, not disbursement, so the acknowledgment of receipt belongs in the contract as a stated fact of its own — and one execution date, not two, belongs in the file.
An English-language “I OWE YOU NOTE” for USD 53,782 said nothing about interest.8 The court held it a valid loan because it named the lender, the borrower and the sum, but struck the claim for 5 per cent a year statutory interest, finding the contract silent and no genuine intention to charge it. Silence on interest is not neutrality. It is a waiver, and the statutory rate will not fill it.
A lender claimed 5 per cent a month on a USD 2,000 loan; the court struck it, fixed 1.5 per cent a month on the ceiling derived expressly from Prakas No. 128, and kept the debt.9 A rate above the ceiling is not refused; it is rewritten.
Two loans of USD 40,000 at 2 per cent a month were capped at 18 per cent a year, with interest already paid above the cap reallocated to principal.10 Interest above the ceiling does not vanish; it becomes a credit.
A bank sued on facilities of USD 150,000 and KHR 200,000,000 at 24 per cent.11 The court cut the ordinary rate to 18 per cent for the pre-maturity period, enforced the 24 per cent late-payment clause as lawful liquidated damages for delay, and refused provisional enforcement. The ceiling governs the price of money, not the price of delay, and the two must be drafted as separate limbs or the first will eat the second.
A plaintiff claimed 64 by 210 metres of land on an oral 1991 purchase and a 1991 request for possession signed by the commune chief.12 The court dismissed: the request had been signed before the signatory took office, which made it an irregular document, and an oral sale confirmed only by a later letter proves nothing. A signature dated before the signatory held the office is worth less than none.
A seller who had already transferred title sued to dissolve the sale when the balance never came.13 The court dissolved it, let the seller keep the USD 10,000 deposit under the agreement, ordered title re-transferred, and cut a pleaded USD 50,000 damages claim to KHR 10,000,000. Forfeiture is a clause, not an assumption. The Code runs the other way on a deposit: a buyer who paid USD 20,000 watched the seller offer double and rescind under Article 518, and lost the claims to transfer and registration.14 A deposit hands the seller an option, and the Code prices it.
A USD 650,000 factory sale-and-construction contract was handed over on 14 September 2016 against a certificate of the same date; minutes of 24 January 2018 fixed the balance at USD 288,535, the buyer paid USD 75,000 and stopped.15 The court awarded USD 213,535 with a 2 per cent monthly penalty from handover. What carried the file was a sequence, not an argument: contract, handover certificate, admitted minutes.
IV. The eighteen per cent ceiling that is not in the statute#
Article 585 of the Civil Code does not set an interest rate. It sets a reference: interest may not exceed the rate “specified by law”, and the number is left to an instrument elsewhere.16 In this sample that instrument is named constantly and quoted rarely. The judgments call it Prakas No. 128 K.Y.Pr.K/11 of 21 December 2011, attribute the eighteen per cent figure to it, and apply its arithmetic as though its text were annexed to the file.9
What matters for a drafter is not the number but the remedy. A claim that crosses the ceiling is not refused; it is rewritten, without ceremony: 3 per cent a month on a USD 354,000 loan became 18 per cent a year running from 8 May 2009 to 2 March 2019, a decade recomputed in one line of the order.17 Two and a half per cent a month was replaced with 18 per cent,18 ten per cent a month was struck,19 and one point eight per cent was restated at 1.5.20
Two consequences are drafting points. The court sets the terminal date; interest is not left running “until full payment”, and where delay compensation begins, ordinary interest stops.21 And interest already paid above the ceiling does not disappear — it moves to principal, in one case computed from the lender’s own statements although no receipts had been issued.10
The next question a lender asks is what happens when the instrument says nothing about interest at all. The answer is not the ceiling. It is zero. An instrument silent on interest yields nothing — not the statutory rate, which is the fallback for a loan meant to bear interest but with no agreed rate, and not a nominal sum. It is struck.8 A rate agreed only orally fares no better: where 3 per cent a month had been agreed by word of mouth, the court confined the award to the principal actually handed over and refused the interest for want of a written stipulation.22
Three cumulative instructions follow. State an annual rate, because the court will convert a monthly one whether or not you do. State it in a signed writing, because an oral rate is a fact you must prove and usually cannot. Give it a terminal date, because the alternative is a date chosen by the bench.
V. Penalty or price for delay: a split the courts have not resolved#
The question that moves more money here than any other is whether a clause charging more after default is a penalty for a breach or a price for a period. The judgments use the vocabulary — penalty interest, late interest, compensation for delay — without agreeing on the consequence, and no appellate decision settles it: most benches enforced a delay rate above the interest ceiling, one read the Prakas as capping it, and reasons and order do not always agree.
On the enforcement side, a 24 per cent late-payment clause was upheld as lawful compensation for delay in the same judgment that cut ordinary interest to 18 per cent.11 Twenty-five per cent a year, expressly agreed as compensation for late payment, was enforced on outstanding principal of USD 92,449.25.23 Thirty-six per cent was enforced on overdue principal and interest, in a judgment that cites Prakas No. 128 expressly and simply does not apply the ceiling to the penalty.24 Three per cent a month was enforced in full on the reasoning that no instrument yet caps this form of compensation in banking, the Prakas being cited only for the interest rate.25 And 9 per cent ordinary interest and 13.5 per cent overdue interest, the latter at 150 per cent of the ordinary rate, were both upheld, the court describing the overdue rate as damages agreed in advance.26 That is the doctrine at its clearest: a penalty priced as a multiple of the rate, accruing as interest accrues, enforced alongside it.
One bench went the other way. A penalty of twice the 14.40 per cent contract rate, that is 28.80 per cent a year, was held “not lawful” under Article 2 of Prakas No. 128 and reduced to 27 per cent; the court accepted that the parties may fix delay interest but read the Prakas as capping the rate all the same.27 And in one judgment the order enforces 28.8 per cent while the reasons describe the claimed penalty as 25 per cent — dispositif and reasons do not agree.28
A third outcome is neither. A 2 per cent monthly penalty was dismissed, but not for duplicating interest: the stated ground was that the claim was “complex and unclear” and prejudicial to the defendants.29 The same judgment dismissed both early-settlement fees at item 3, because the clause allowed the fee only where the borrower asks to repay early, and these borrowers never asked. An unclear clause dies of its own obscurity; it does not need a doctrine to kill it.
What the sample agrees on is the period, not the rate. Two benches refused to let interest and delay compensation run over the same months: interest to the date of filing and the penalty only from then,30 or interest to maturity at 1.10 per cent a month and the penalty at 2 per cent a month afterwards.21 Both treat the penalty as the price of a period, and both cut the total yield the moment the streams are made consecutive.
The split will not settle itself. The eighteen per cent figure and the twenty-seven per cent figure come from the same instrument: a bench that reads Article 2 as governing delay interest caps at 27, one that reads it as governing the contract rate alone enforces 36. The consequence is neither that the cap binds penalties nor that it does not; it is that a clause priced above the ceiling carries an unpriced risk that surfaces at enforcement, years after the pricing decision was made. It usually works, which is the danger.
Two drafting points follow, both cheap. Trigger on missed instalments rather than a future calendar date: a 3 per cent penalty keyed to a maturity date that had not yet arrived was refused as a claim for performance at a future time.31 And state the base, because a penalty on overdue principal and one on overdue principal and interest are different instruments with the same headline rate.
VI. Security is registration, or it is decoration#
The orders on security are short and say the same three things. In the USD 1,000,000 facility, the court recognised the hypothec as a preferential right, identifying the property the way a registry does: by ownership-certificate number and issue date.32 In another, the hypothec was created under Article 844 of the Civil Code over titled land and registered with the land department, and all three co-defendants were ordered to pay.33 In a third, the charge was recognised on a record of three documents: the credit contract, the mortgage contract identifying the land by certificate number and issue date, and the registration.34
That is the pattern, and it is narrower than it is usually reported to be. What these judgments establish is what the court points to when it grants the preferential right: a registered instrument over an identified title, in a file that also contains the contract it secures. They do not establish what happens when registration is missing. The most cited of them does not address an unregistered hypothec at all — the mortgage before that court was registered, and it was recognised for exactly that reason. In this sample, no preferential right was recognised on a record that lacked a registered charge over a title identified by number; whether the converse holds is untested here.
Two further points, about timing and consent rather than form. The charge should exist on the day the money moves: in one judgment the hypothec was executed the same day as the loan, described by certificate number and issuing department, and that record carried the lender to provisional enforcement of the principal.35 And every co-owner should be a party, because a charge over family land is enforced against the family or not at all.
The court will not identify the asset for you. A clause describing the property by the borrower’s name, or by the amount of the facility, describes nothing a registrar can register and nothing a court can enforce. The description that works is the one printed on the certificate.
VII. Why your own invoice proves nothing#
The printing case is the judgment to read on a bad day.36 A company registered in Malaysia sued for USD 75,955.98 for directory work supplied in 2015 and 2016, including interest to 1 October 2017, and claimed 1.5 per cent a month thereafter. The defendant never appeared. The claim was dismissed in its entirety, with costs against the plaintiff.
The reason is entirely documentary. The court listed what had been produced — purchase orders, delivery notes, invoices, itemised lists, exchange-rate tables — and held that most did show orders placed between the parties, but that none stated the price of the goods, none could establish the size of the debt, and the signatures and seals could not be shown to be those of the defendant or of any representative with authority to bind it. The documents had been made by the plaintiff and acknowledged by nobody; and because the principal could not be fixed, the interest and damages claims could not be considered either.
Nothing in that file was forged. Most of it was probably true. It was simply unproved, and the absence of a defendant does not turn an unproved claim into a proved one. A default is not evidence.
The contrast is a statement of account. Where a bank produced a debt-status statement issued by its credit department itemising principal, interest, form fees and penalty separately, the court gave judgment for USD 461,000 with 8 per cent interest, a 1 per cent form fee and an 8 per cent penalty, each on its own footing.37 The difference is that one creditor brought a schedule and the other brought a pile.
Damages obey the same logic: a round sum is cut down, and a claim already covered by interest and penalty is struck. USD 50,000 pleaded became KHR 10,000,000;13 USD 200,000 claimed on a jewellery debt became USD 80,000;38 a USD 9,500 claim for fees and lost time became 2,000,000 riel;23 and a USD 20,000 distress claim was struck in an order that had already given interest and a 12.75 per cent penalty for the same default.32 Four claims, one pattern: the sum that survives is the one that can be computed from the file. A round number tells the bench nobody computed anything, and a bench that has just done the arithmetic is not going to invent a fifth figure to sit on top of it.
The instruction is therefore not “claim less” but “claim in items”: unit price, quantity and total on every invoice; the countersignature of a named officer whose authority you can prove; one schedule for interest and another for delay; and, where the loss is distress rather than money, a figure the judgment can describe.
VIII. The win that cannot be collected#
A first-instance judgment in this sample is a decision, not a payment. Whether it may be enforced while an appeal is open is decided separately, and answered differently by different benches. It was granted in the 18 per cent judgment, where point 1 of the order, the principal, was made provisionally enforceable and interest, damages and costs were left to wait.10 It was refused where a debtor had admitted a KHR 26,000,000 undertaking: the court ordered payment, then struck the request, holding that a provisional order carries the effect of a final judgment and that an appeal could alter the result.39 It was refused again in a judgment that had just enforced a 24 per cent delay rate for the lender.11
So the answer is discretionary, and it does not track the merits: the party who wins on the rate can still lose on the timing. Plead it, as a numbered claim, because silence forfeits even the chance. And price nothing on the assumption that it will be granted: a facility whose economics depend on collecting a first-instance judgment before appeal is priced on a discretion to be exercised by someone who has not yet read the file.
IX. Conclusion: draft for the bench you will actually get#
Seven instructions, each tied to a judgment already cited. They are not a template; they are what the sample rewards.
Write the rate as an annual percentage, at or below eighteen. The ceiling is applied as arithmetic, not as a discretion: a 5 per cent monthly claim was struck and 1.5 per cent applied, and a 3 per cent monthly rate on a USD 354,000 loan was recomputed at 18 per cent across a decade.917
Never leave interest to implication. An instrument silent on interest yields nothing at all, not the statutory rate,8 and an oral rate yields nothing either.22 Put the rate in a signed writing, in figures and in words, and give it an end date.
Price delay as a period, not a second income. Label the clause compensation for delay, state the base, the rate and the start date, and stop ordinary interest when it begins.30 Above 27 per cent you are betting on the bench: 36 per cent was enforced in one judgment, 28.8 per cent cut to 27 in another.2427
Register the security and identify the title by certificate number and issue date. Every preferential right recognised in this sample rested on a registered instrument over an identified title, and every co-owner of the charged land was a party.323334
Do not rely on your own paperwork. Invoices stating no price, bearing signatures nobody can attribute, lost a USD 75,955.98 claim against a defendant who never appeared.36 State unit price, quantity and total, and take the countersignature of a named officer whose authority you can prove.
Itemise damages. Round sums are cut, not refused: USD 50,000 became KHR 10,000,000, USD 200,000 became USD 80,000, USD 20,000 was struck.133832
Plead provisional enforcement, and do not plan on it. Granted in one judgment, refused in two — one of which gave the lender its 24 per cent rate in the same breath.103911
The honest summary is narrower than a rule. This is what 108 first-instance judgments did between 2015 and 2020: they rewrote interest rather than refusing it, they mostly enforced delay clauses and once read a ceiling into them, they recognised security where it was registered against an identified title, they cut unliquidated damages, and they answered provisional enforcement differently in different courtrooms. On the question that matters most to a lender — whether the ceiling reaches a penalty — the appellate rule does not exist yet. Until a higher court writes one, the choice is between a clause that is safe and a clause that is usually profitable, and the difference is a risk nobody in the sample has priced.
Disclaimer#
The views expressed are solely my own and are shared for general informational and discussion purposes only. They do not constitute legal advice and should not be relied upon as a substitute for professional legal counsel. These views do not represent or reflect the positions, opinions, or policies of my current employer, any former employers, clients, or affiliated organizations. The author has no client, mandate, or financial interest in any party to any judgment discussed here. The judgments were read from the author’s own document collection; the translations are the author’s. Readers are encouraged to seek advice from a qualified legal professional regarding their specific circumstances.
Doc ID: 142294 — Civil Code of Cambodia, promulgated 8 December 2007; Arts. 579, 584, 585 and 518. ↩︎
Doc ID: 160182 — Phnom Penh Court of First Instance, case number blank (anonymised copy), 20 February 2015; the earliest judgment in the sample. ↩︎ ↩︎
Doc ID: 160264 — Phnom Penh Municipal Court, No. blank in the text (anonymised copy), 30 April 2019; a USD 20,000 deposit on a land sale, Article 518 applied. ↩︎
Doc ID: 143352 — Supreme Court (cassation), No. 215 “K”, 2 July 2020; remitted for a fresh hearing on whether the money was paid, without deciding the merits. ↩︎
Doc ID: 143351 — Phnom Penh Court of Appeal, No. 40, 18 November 2019; a pending criminal charge held not to suspend the civil appeal. ↩︎
Doc ID: 143274 — Phnom Penh Court of First Instance, No. 1533 “Nh”, 29 November 2019; a USD 7,511 rent claim struck out for non-appearance, no merits finding. ↩︎
Doc ID: 143352 — as above, n 5; the contract dated 06 May 2017 in the facts and 06 June 2017 in the cassation reasoning. ↩︎
Doc ID: 143251 — Phnom Penh Municipal Court, No. 828 “M”, 4 July 2019; an “I OWE YOU NOTE” for USD 53,782 held valid, the 5 per cent a year claim struck for silence. ↩︎ ↩︎ ↩︎
Doc ID: 143249 — Phnom Penh Court of First Instance, No. 820 “J1”, 1 July 2019; 5 per cent a month struck and 1.5 per cent applied on the ceiling derived from Prakas No. 128 K.Y.Pr.K/11 of 21 December 2011. ↩︎ ↩︎ ↩︎
Doc ID: 143319 — Phnom Penh Court of First Instance, No. 1447 “Nh”, 14 November 2019; capped at 18 per cent, excess interest reallocated to principal leaving USD 37,254.40, point 1 provisionally enforceable. ↩︎ ↩︎ ↩︎ ↩︎
Doc ID: 143322 — Phnom Penh Court of First Instance, No. 1544 “R”, 5 December 2019; interest cut from 24 per cent to 18 per cent, the 24 per cent delay clause enforced, provisional enforcement refused. ↩︎ ↩︎ ↩︎ ↩︎
Doc ID: 143335 — Preah Sihanouk Provincial Court, No. 75/03 “Kh”, 11 September 2019; 64 m × 210 m claimed on an oral 1991 purchase, dismissed because the possession request pre-dated the signatory’s office. ↩︎
Doc ID: 143259 — Phnom Penh Municipal Court, No. 11.21 “Th”, 6 September 2019; sale dissolved, the USD 10,000 deposit forfeited, a USD 50,000 damages claim cut to KHR 10,000,000. ↩︎ ↩︎ ↩︎
Doc ID: 160264 — as above, n 4; the seller offered double the deposit and rescinded, the buyer’s claims to transfer and registration dismissed. ↩︎
Doc ID: 143275 — Phnom Penh Municipal Court, No. 847 “Th”, 10 July 2019; a USD 650,000 factory contract handed over 14 September 2016, minutes of 24 January 2018 fixing USD 288,535, USD 75,000 paid, USD 213,535 awarded with a 2 per cent monthly penalty. ↩︎
Doc ID: 142294 — Civil Code of Cambodia, promulgated 8 December 2007; Article 585 caps interest at the rate specified by law, Article 584 sends an unspecified rate to the legal rate. ↩︎
Doc ID: 143260 — Phnom Penh Municipal Court, No. 1126 “S”, 9 September 2019; 3 per cent a month on USD 354,000 replaced with 18 per cent a year from 8 May 2009 to 2 March 2019. ↩︎ ↩︎
Doc ID: 143263 — Phnom Penh Municipal Court, No. 991 “Ng”, 19 August 2019; 2.5 per cent a month held to exceed the 18 per cent ceiling; 18 per cent a year awarded. ↩︎
Doc ID: 143337 — Banteay Meanchey Provincial Court, No. 45 (3), 8 August 2019; 10 per cent a month struck and replaced with 18 per cent a year. ↩︎
Doc ID: 143334 — Phnom Penh Municipal Court, No. 826 “Kh”, 3 July 2019; 1.8 per cent a month restated at 1.5 per cent. ↩︎
Doc ID: 143310 — Tbong Khmum Provincial Court, No. 343 “Chha”, 8 October 2019; interest and delay compensation refused over concurrent periods, 1.10 per cent a month to maturity and 2 per cent a month thereafter. ↩︎ ↩︎
Doc ID: 143291 — Phnom Penh Court of First Instance, No. 1505 “B”, 27 November 2019; principal fixed at the USD 45,500 actually handed over, 3 per cent a month refused for want of a signed stipulation. ↩︎ ↩︎
Doc ID: 143342 — Siem Reap Provincial Court, No. 25 “Kor”, 27 June 2019; a 25 per cent penalty enforced on USD 92,449.25, and a USD 9,500 claim for fees and lost time cut to 2,000,000 riel. ↩︎ ↩︎
Doc ID: 143346 — Phnom Penh Municipal Court, No. 58 “Chha 1”, 17 January 2020; USD 77,980.46 with 11 per cent interest and a 36 per cent penalty, Prakas No. 128 cited but not applied to the penalty. ↩︎ ↩︎
Doc ID: 143315 — Kratie Provincial Court, No. 39 “Ng”, 28 June 2019; a 3 per cent a month penalty enforced in full, no instrument yet capping this form of compensation in banking. ↩︎
Doc ID: 143292 — Phnom Penh Court of First Instance, No. 1501 “T”, 26 November 2019; a 9 per cent rate and a 13.5 per cent overdue rate both upheld, USD 240,000 principal awarded, the USD 50,000 damages claim refused. ↩︎
Doc ID: 143316 — Banteay Meanchey Provincial Court, No. 75 “Chha”, 21 August 2019; a 28.80 per cent penalty held “not lawful” under Article 2 of Prakas No. 128 and reduced to 27 per cent. ↩︎ ↩︎
Doc ID: 143343 — Kampong Thom Provincial Court, No. 17 “A”, 31 July 2019; the order enforces 28.8 per cent while the reasons describe the penalty as 25 per cent. ↩︎
Doc ID: 143350 — Phnom Penh Court of First Instance, No. 117 “K”, 30 January 2020; 2 per cent monthly penalty dismissed as “complex and unclear”; fees of USD 585.49 and USD 48.75 dismissed at item 3. ↩︎
Doc ID: 143307 — Tbong Khmum Provincial Court, No. 292 “Chha”, 17 September 2019; 13.2 per cent interest to filing and the 25 per cent penalty only from then. ↩︎ ↩︎
Doc ID: 143345 — Takeo Provincial Court, No. 017 “Ch”, 5 December 2019; a 3 per cent penalty keyed to a maturity date not yet arrived refused as performance at a future time. ↩︎
Doc ID: 143283 — Phnom Penh Court of First Instance, No. 1552 (case file 1554), 6 December 2019; a USD 1,000,000 facility at 8.5 per cent, the registered hypothec over land identified by certificate number recognised, the 12.75 per cent penalty upheld, a USD 20,000 distress claim struck. ↩︎ ↩︎ ↩︎ ↩︎
Doc ID: 143253 — Phnom Penh Court of First Instance, No. 943 “Kha”, 6 August 2019; a hypothec under Article 844 over registered title-certificate land recognised, all three co-defendants ordered to pay. ↩︎ ↩︎
Doc ID: 143269 — Phnom Penh Municipal Court, No. 1319 “Th”, 17 October 2019; the hypothec on a USD 100,000 loan recognised on the credit contract, the mortgage contract and the land-department registration. ↩︎ ↩︎
Doc ID: 143250 — Phnom Penh Municipal Court, No. 822 “J”, 1 July 2019; a hypothec charged the same day as the loan, USD 149,553.97 principal, provisional enforcement granted. ↩︎
Doc ID: 143280 — Phnom Penh Municipal Court, No. 1502 “T”, 26 November 2019; USD 75,955.98 claimed and dismissed in full though the defendant never appeared. ↩︎ ↩︎
Doc ID: 142328 — Phnom Penh Municipal Court, No. 859 “J1”, 12 July 2019; USD 461,000 with 8 per cent interest, a 1 per cent form fee and an 8 per cent penalty, on a debt-status statement of 19 September 2018. ↩︎
Doc ID: 143267 — Phnom Penh Court of First Instance, No. 960 “Chha”, 9 August 2019; USD 740,936 principal on a written acknowledgment, a USD 200,000 damages claim cut to USD 80,000. ↩︎ ↩︎
Doc ID: 143301 — Siem Reap Provincial Court, No. 18 “Chh”, 10 July 2019; provisional enforcement of a KHR 26,000,000 judgment refused, the request forming claim 3. ↩︎ ↩︎